top of page


Who Was the Rocky Flats Cleanup Designed to Protect? A 2001 Report Asked Us to Think About Future Generations
Before Rocky Flats' accelerated cleanup was completed, independent researchers questioned whether the proposed soil standards would protect future generations. A 2001 IEER report recommended considering plutonium levels of 1–10 picocuries per gram, challenging assumptions that wildlife refuge designation and land-use restrictions could provide protection over thousands of years. What standards were ultimately adopted, and why does that distinction still matter?

Tiffany Hansen
Oct 207 min read


Rocky Flats: From the 1989 Shutdown to an Accelerated Cleanup
After the 1989 FBI raid halted plutonium production, Rocky Flats underwent an accelerated cleanup that reached physical completion in 2005. More than 800 structures were removed, but the cleanup did not eliminate all contamination. What remained, how were the decisions made, and why does Rocky Flats still require long-term environmental stewardship?

Tiffany Hansen
Jan 1, 20059 min read
bottom of page
_edited.jpg)